Moved the filler neck on the tank in anticipation of the Honda Dream 50R hold-down strap that will hopefully be used. There is a little bit of work yet to be done where the strap comes over the front of the tank. The forks have been reassembled with CRF70 tubes and the original springs. The original springs were a bit longer than the CRF ones, making for more pre-load than they had on either fork set-up. Getting ready to take hardware for zinc plating.